General Permit Requirements
- Contractor License
- COI (Certificate of Insurance)
- Certificate Holder (City of Oak Hill)
- Site plan with setbacks
- Signed copy of contract
Emailed to code.officer@oakhilltn.us
Filing Subdivision Plat
- Preliminary Plat - $1,000 base fee plus $250 per lot over two lots. Includes up to 2 reviews. Additional plat reviews shall be $250 per review. Over four lots require preliminary review and final review.
- Final Plat - $1,000 base fee plus $250 per lot over 2 lots. Includes up to 2 reviews. Additional plat reviews shall be $250 per review. Less than four lots do not require preliminary review.
- Recording construction plan for Subdivisions - $500
- New subdivision sign or subdivision sign modification fee - $500
- Other new signs or sign modification fee - $250
Presentation Fee to Board of Zoning Appeals/Planning Commission
- Variance/Administrative Appeal - $250
- Conditional Use Permit without the addition of impervious surface, non-variance - $1,000
- Conditional Use Permit with the addition of impervious surface, non-variance - $4,000
Other Fees
- Residential Plan Review Fees - $150 per hour
- C.U.P. Holders Plan Review Fees - $100 per hour
- Steep Slope Review Fee - $1,000, includes up to 2 reviews. Additional reviews are $500 each.
- Radnor Lake Overlay Fee - $1,000, includes up to 2 reviews. Additional reviews are $500 each.
- If the review is both a steep slope and Radnor Lake impact review, the fee is $2,000. Includes up to 2 reviews. Additional reviews are $500 each.
Notes
- If construction is started before a permit is obtained, the Permit Fee will be doubled.
- Job Costing includes demolition costs, driveways, pools, etc.
- Inspections in excess of the respective number of inspections listed below will be charged at a rate of $125.00 per inspection, and payment to the City shall be made in full by the applicant prior to the issuance of the Use and Occupancy permit by the City.